SITE |
PROJECT |
BEG-FIN |
CONTROL SYSTEM |
CONTRACTOR |
| SE
a.s.
Power plant Vojany I |
General
repair unit 110 MW No.1
General design of control
system |
1988-1989 |
DASOR
610 (ČS)
DIAMO, MODIN |
Škoda |
| SE
a.s.
Power plant Vojany I |
General
repair unit 110 MW No.2
General design of control
system |
1990-1992 |
DASOR
610 (ČS)
DIAMO, MODIN |
Škoda |
| Heating
plant Pécs
Hungary |
Reconstruction
of c. sys. of 4x125t/h boilers
General design of control
system
Balance calculations |
1986-1991 |
CIRIS
DIAMO
MODIN |
Škoda-export
|
| SE
a.s.
Power plant Nováky B |
General
repair unit 110 MW No.1
General design of control
system
Ecological measurements
Own consumption control |
1992-1993 |
ROSEMOUNT
RS3
A-B PLC5 |
Škoda |
| SE
a.s.
Power plant Nováky B |
General
repair unit 110 MW No.2
General design of control
system
Ecological measurements
Burner automatics
Boiler spraying and fans
and ljung,
Real- time energy and balance
calculations
Own consumption control |
1994-1995 |
ROSEMOUNT
RS3
A-B PLC5
A-B SLC5 |
Škoda |
| Calex
Zlaté Moravce |
Boiler
2 x 40 t/h
General design of control
system |
1993-1993 |
A-B
SLC5
PC ControlView |
SES
Tlmače |
| VSŽ
Košice |
Oxygen
generator KY7
General design of control
system |
1992-1993 |
ROSEMOUNT
RS3
A-B PLC5 |
VSŽ
Košice |
| SE
a.s.
Heating plant Košice |
Reconstruction
of individual process nodes
-PARS (performed by SCADA)
-RS of gas, etc. |
1993-1996 |
A-B
SLC5, PLC
PC ControlView
PC InTouch
A-B AC drivers |
SE
a.s.
Heating Plant Košice |
| Szabadegyháza, Hungary |
Flue
gas boiler 40 t/h
Contr. sys. for automatic
boiler operation |
1995-1996 |
SIEMENS
SIMATIC S5 |
Ganz
Transelektro |
| Heating
plant VSŽ Košice |
Installation
of gas burners for boiler K1,
240 t/h
General design of control
system,
Emissions measurement (for
ABB Slovakia) |
1995-1996 |
Hartmann&Braun
DIGIMATIK |
ABB |
| Heating
plant VSŽ Košice |
Reduction
station - control system |
1995 |
A-B
SLC5 |
ABB |
| SE
a.s.
Power plant Vojany |
Unit
110 MW No. 26
Reconstruction of boiler
room and machinery room regulation circuits |
1995 |
VALMET
DAMATIC XD |
SE
a.s. |
| SE
a.s.
Power plant Vojany |
Heavy
oil station
Reconstruction of control
system |
1995 |
A-B
SLC5
A-B AC drivers |
SE
a.s. |
| SPP,
a.s.
Stretava |
Extraction
station contr. system and remote monitoring
(SCADA - Stretava - Michalovce) |
1995 |
A-B
SLC 5
PC InTouch |
Nafta
Gbely |
| Skloplast
Trnava |
Control
system of selected process nodes |
1995-1996 |
ROSEMOUNT
RS3
A-B SLC5
A-B AC drivers |
Skloplast
Trnava |
| SE
a.s.
Power plant Nováky B |
Desulphurization
of units 1 and 2, 110 MW
own consumption management
incl. back-ups
(for ŠKODA Praha) |
1996-1997 |
ROSEMOUNT
RS3
A-B PLC 5 |
Škoda
Praha |
| SPP,
a.s.
Trhovište |
Extraction
station contr. system and remote monitoring
(SCADA - Trhovište - Michalovce) |
1996 |
A-B
SLC 5
PC InTouch |
Nafta
Gbely |
| Bukóza
Vranov |
Evaporator
control system, incl. software |
1996 |
ROSEMOUNT
RS3 |
Bukóza
Vranov |
| SMZ
Jelšava |
Gas
boiler regulation , 25-40 t/h |
1996 |
A-B
SLC 5 |
SMZ
Jelšava |
| SE
a.s.
Power plant Nováky B |
Unit
110 MW No.1
Burner automatics
Boiler spraying and fans
and ljung |
1996 |
A-B
PLC 5
A-B SLC 5 |
SE
a.s. |
| SE
a.s.
Heating plant Košice |
Boiler
operation optimization PK4, 240 t/h
information and regulation
circuits |
1996 |
I/A
Series FOXBORO
(cooper. ContEx) |
SE
a.s. |
| SE
a.s.
Power plant Vojany |
Turbine
control system 110 MW, units 21, 22
Turn key delivery |
1996 |
WOODWARD
NetCon 5000
(cooper. ŠKODA) |
SE
a.s. |
| SE
a.s.
Power plant Vojany |
110MW
units 1, 2
Desulphurization and denitrification
Turn key delivery |
1997-2000 |
VALMET
DAMATIC XD |
SES
Tlmače |
| SE
a.s.
Power plant Vojany |
110
MW units 23, 24
Reconstruction of boiler
room and machinery room measure and regulation circuits
+ Turbine control system
Turn key delivery |
1997
(11 months) |
VALMET
DAMATIC XD
WOODWARD
NetCon 5000 |
SE
a.s |
| SE
a.s.
Power plant Vojany |
110
MW units 21, 22
Reconstruction of boiler
room and machinery room measure and regulation circuits
+ Turbine control system
Turn key delivery |
1998-2000
(4 months / unit) |
VALMET
DAMATIC XD
WOODWARD
NetCon 5000 |
SE
a.s. |
| SE
a.s.
Power plant Vojany |
110
MW units 21, 22, 23, 24
Reconstruction of measure
and regulation circuits - burners
Turn key delivery |
1998-2000
(11 months) |
VALMET
DAMATIC XDi |
SES
Tlmače (AEE). |
| SE
a.s.
Power plant Nováky B |
110
MW unit 3
Reconstruction of information
system
installation and engineering |
1997
(5 months) |
A-B
PLC 5
PC InTouch |
SE
a.s.
SES Tlmače |
| SE
a.s.
Power plant Nováky B |
110
MW unit 4
Reconstruction of boiler
and machinery control systems + turbine control system
Turn key delivery |
1998
(4 months) |
WOODWARD
NetCon 5000,
A-B PLC 5
PC InTouch |
SE
a.s. |
| Power
plant
Nuevitas
Cuba |
2
x 125 MW
Reconstruction of measure
and regulation circuits, information system
Turn key delivery |
1998-2000 |
YOKOGAWA
DCS |
SES
Tlmače. |
| MG
Slovnaft
Bratislava |
MG
Slovnaft
Feeder of hydrogen and nitrogen |
1998
(2 months) |
ROSEMOUNT
RS3 |
MG-Slovnaft |
| SE
a.s.
Power plant Vojany |
110MW
units 5, 6
Renovation of units on Key
delivery |
1998-2001 |
SIEMENS
TELEPERM XP |
SES
Tlmače |
|
Skloplast Trnava |
Control
and information system of glass furnace (70t/h) |
1999 |
ROSEMOUNT
RS 3
A-B SLC 5 (for selected
nodes) |
Skloplast
Trnava |
|
SMZ Jelšava |
Control
and information system |
2000-2001 |
A-B
SLC 5 + In Touch |
SMZ
Jelšava |
|
Power plant
Santa Cruz del Norte
Cuba |
3x100MW
boiler control |
2000 |
YOKOGAWA
DCS |
SES
Tlmače |
|
Skloplast Trnava |
Control
and information system of glass furnace (140t/h) |
2000-2001 |
ROSEMOUNT
RS 3
A-B SLC 5 |
Skloplast
Trnava |
| SE
a.s.
Power plant Vojany |
110
MW unit 2
Reconstruction of boiler
and machinery control system |
2001
(3 months) |
DAMATIC
XDi, METSO |
SE
a.s. |
| SE
a.s.
Power plant Vojany |
110
MW unit 1
Reconstruction of boiler
and machinery control system |
2002 |
DAMATIC
XDi, METSO |
SE
a.s. |
| SE a.s.
Power plant Vojany |
110
MW unit 1 and 2
Turbine control system |
2000-2002 |
MicroNet,
WOODWARD |
SE
a.s. |
| Heineken
Hurbanovo
Brewery |
Production
and Delivery of Sivacon switchboards |
2002 |
Not
included in delivery |
Siemens,
s.r.o. |
| U.
S. Steel Košice |
Service
repair for RS :
RS3, RS Hartmann Braun,
RS Aleen Bradley |
1/2002 to 12/2002 |
Not
included in delivery |
U.
S. Steel Košice, s.r.o. |
| U.
S. Steel Košice |
Elektrolytic
tin coating line No.2 – LV Power supply distribution, Cable
routes |
2002 |
Not
included in delivery |
U.
S. Steel Košice, s.r.o. |
| U.
S. Steel Košice |
Continual
annealing line No.2 – Delivery and Assembly for Plant Heavy
Current Distribution, LV Cable routes |
2002 |
Not
included in delivery |
U.
S. Steel Košice, s.r.o. |
| Spaľovňa
Bratislava
Incineration plant |
Production
and Delivery of 2 SIVACON 400 kVAr switchboards |
2002 |
Not
included in delivery |
Siemens,
s.r.o. |
| U.
S. Steel Košice |
Continual
annealing line No.2 – lighting of decking |
2002 |
Not
included in delivery |
U.
S. Steel Košice, s.r.o. |
| Tauris
Rimavská Sobota |
Production
and Delivery of switchboards |
2002 |
Not
included in delivery |
RVT
SiemControl s.r.o. |
| U.
S. Steel Košice |
Elektrolytic
tin coating line No.2 -
lighting of line,
Waste water treatment and
Chemical engineering – electric
installation |
2003 |
Not
included in delivery |
U.
S. Steel Košice, s.r.o. |
| U.
S. Steel Košice |
Elektrolytic
tin coating line No.2 – Waste water pumping |
2003 |
Not
included in delivery |
U.
S. Steel Košice, s.r.o. |
| U.
S. Steel Košice |
Service
repair for RS :
RS3, RS Hartmann Braun,
RS Allen Bradley |
1/2003 to 12/2003 |
Not
included in delivery |
U.
S. Steel Košice, s.r.o. |
| SCP
Ružomberok |
Production
and delivery of switchboards |
2003 |
Not
included in delivery |
MONTIN
spol.s.r.o. |
| SPP-
Jablonov |
Needle
valves exchange in high pressure oil system TS11 - TS12
|
2003 |
Not
included in delivery |
SPP,
a.s. |
| ZPS
Moravany |
Adaptation
of electric device for cooling compressors for ZPS Moravany |
2003 |
Not
included in delivery |
Nafta
Východ, a.s. |
| SE
a.s.
Tepláreň Košice
Heating plant Košice |
IPR
Reconstruction of protectors – part: boiler plant |
2003 |
Not
included in delivery |
SE
a.s.
Tepláreň Košice |
| SCP
Ružomberok |
Production
and Delivery of MCC switchboards |
2003 |
Not
included in delivery |
Siemens,
s.r.o. |
| SCP
Ružomberok |
Production,
Delivery and Installation of PDC switchboards |
2003 |
Not
included in delivery |
Siemens,
s.r.o. |
| SE
a.s.
Power plant Vojany |
Metering
of water take-off from Laborec river |
2003 |
Not
included in delivery |
SE
a.s.
Elektráreň Vojany OZ |
| Tepláreň
Košice a.s.
Heating plant Košice |
Pause-free
feeding of control technics and automatic devices of RtaA
source |
2003 |
Not
included in delivery |
Tepláreň
Košice a.s. |
| SCP
Ružomberok |
Delivcery
of MCC switchgears
“Screening and Pulp” |
2003 |
Not
included in delivery |
Siemens,
s.r.o.
Stromová 9, Bratislava |
| Palma-Agro
Sečovce |
Service
works on Allen Bradley Control System |
2003 |
Allen
Bradley |
Palma-Agro
a.s.
Kollárova 1657/16
Sečovce |
| U.
S. Steel Košice |
Manufacture
of transmission modules MRK 05 |
2003 |
Not
included in delivery |
U.
S. Steel Košice, s.r.o.
Vstupný areál U. S. Steel,
Košice |
| U.
S. Steel Košice |
Pump
station of Sulphur Acid
Heavy Current, Metering
and Regulation |
2003 |
Not
included in delivery |
Energoservis
a.s.
Košice |
| SCP
Ružomberok |
Delivery
of MCC switchgears including incoming fields and compensations
– Regeneration Boiler 2 |
2004
in process |
Not
included in delivery |
Siemens,
s.r.o.
Stromová 9, Bratislava |
| U.
S. Steel Košice |
Erectioon
Works
Dynamo Line no. 3 |
2003-2004 |
Not
included in delivery |
Elektrovod
Holding a.s.
Čulenova 5
Bratislava |
| Johns
Manville Slovakia, a.s. Trnava |
Delivery
of switchboards for Delta V Control System |
2004
in process |
Emerson
Process Management – Delta V |
Emerson
Process Management
Hanulova 5/B
Bratislava |
| U.
S. Steel Košice |
Service
works on RS3, Hartmann Braun, Allen Bradley Control systems |
1/2004 to 12/2004 |
Fisher
Rosemount RS 3
Hartmann Braun K1
Allen Bradley |
U.
S. Steel Košice, s.r.o.
Vstupný areál U. S. Steel,
Košice |